![]() ![]() The areas near the Green Line Metro Mumbai are the best for residential purposes. Residential Projects Near Green Line Metro Mumbai Here are some of the top eateries and restaurants to please your palate: There are many restaurants near the Green Line Metro. Green Line Metro Mumbai Distance to Nearby Landmarksīelow are some of the famous landmarks situated near the Green Line Metro Mumbai:Ģ.1km from Cambridge International Preschoolġ.7km from Trimurti English High School and Junior CollegeĢ.2km from Brahmand Multispeciality HospitalĢ.6km from Tieten Medicity - Super Speciality Hospital Here is a list of basic yet essential facilities that are available at all the metro stations in Mumbai. However, MMRDA is planning to integrate cutting-edge technology into its automatic fare collection (AFC) system to support the use of Near Field Communication (NFC) phones and QR codes. The pricing, guidelines, and fare structure for the Green Line have not yet been announced. ![]() In fact, the distance between Thane and the mainland city will be quickly covered by this Metro line. With a stretch of 35.25 km, 32 stations, and 5 interchanges along the route, Metro lines 4 and 4A that connect Wadala TT to Gaimukh would be the longest rail corridor in the Mumbai Metropolitan Region. This under-construction line will have two elevated stations at Gowniwada and Gaimukh. The Mumbai Metro Green Line 4A, Which will cost Rs 949 crore, will have a metro car depot at Mogharpada spanning across 20 hectares. In March 2019, the MMRDA issued a request for proposals, and in September 2019, J Kumar Infraprojects secured civil construction work worth Rs 342 crore. Line 4A – Connecting Kasarvadavali with Gaimukh, Line 4A will extend the Green Line north by 2.88km. The project is expected to cost around 14,549 crores. ![]() The line will have a depot measuring 15.50 hectares at Vikhroli. The metro line will run along LBS Marg and Eastern Express Highway in eastern Mumbai. Line 4 – The under-construction Mumbai Metro Green Line 4 will connect Kasarvadavali in Thane with Wadala in central Mumbai. The Green line metro station Mumbai is being constructed in four segments or parts: As part of an extensive branding drive to establish style rules, MMRDA publicly announced the line's official colour on February 28, 2020, with consultation from Systra MVA Consulting.Īlso read: Metro Maps of Top Cities in India Green Line Metro Route Map The first phase of the Green Line is scheduled to begin in 2023, and there will be a number of interchanges that will link it to other metro lines, buses, and suburban rail services. The proposed Green Line metro was launched with the goal of providing local residents with alternative transportation options. Under these packages, a 32.32 km corridor between Wadala and Kasarvadavali in eastern Mumbai would be built along LBS Marg and the Eastern Express Highway.Ī joint venture between Tata Projects Limited and China Harbour Engineering Company secured the final two packages, valued at Rs. 1,584 crores (USD 200 million) were awarded to a joint venture between Reliance Infrastructure and the Italian multinational company Astaldi S.p.A. The Green Line metro Mumbai construction is divided into five different packages based on the engineering, procurement, and construction (EPC) model. MMRDA will also build metro stations and depots in Thane's Vikhroli and Owala villages. The MMRDA (Mumbai Metropolitan Region Development Authority) manages the entire Green Line Metro Station project. Once completed, the Green Line will connect Shivaji Chowk – Gaimukh – Kasarawadavali and Wadala and become nearly 57.11 km long with 48 stations. The metro line will also help extend the Mumbai Metro Line 4 from Bhakti Park Wadala Metro Station to Chhatrapati Shivaji Maharaj Terminus. The Green Line Mumbai Metro Line 11 project will be partially underground with ten stations. The MMRC is thus planning to make a few changes to the route so that more people can conveniently board this line. However, there are plans to tweak its route from the 2018-approved alignment.Īs per officials, since the alignment passes through a portion of the MbPT (Mumbai Port Trust), the stations may not get enough ridership. ![]() Route of Mumbai's Green Line 11 Metro To Be TweakedĪpril 2023: The construction of the Green Line metro from Chhatrapati Shivaji Maharaj Terminus (CSMT) to Wadala is expected to begin soon. The Green Metro Line 4 corridor proposal received approval from the Maharashtra cabinet on September 27, 2016, and Prime Minister Narendra Modi laid the foundation stone on December 24, 2016. The 57.18km-long fully elevated Green Line Metro Station ( Lines 4, 4A, 10, 11), which is currently under construction, will interconnect Shivaji Chowk (Mira Road), Gaimukh, Kasarawadavali, Wadala and CST through 48 stations. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |